Warehousing is a large contributing factor to the UK economy, making up one of the largest parts of the UK property market. Large warehouses (100,000 sq ft and over) now cover just under 690 million sq ft across Great Britain. That’s 22% more than in 2021, according to Savills and the UK Warehousing Association (UKWA). Together with logistics, the sector contributes an estimated £163bn to the UK economy. Online retail, manufacturing and businesses holding more stock have all driven demand. Warehouses are now central to how the UK makes, stores and moves goods.
In this guide we’ll be providing you with an overview of the fit out or refurbishment of warehouse premises, what’s included, whether it’s best to fit out or refurbish, project stages, costs and timelines, compliance and a couple of successful fit outs we’ve provided.
What’s Included in a Warehouse Fit Out?
A warehouse fit out has a lot in common with an office fit out, with a few important differences. Below are the main elements that go into most, if not all, projects.
Mezzanine Floors: Simply put, a mezzanine adds a second level inside the existing building, this is usually utilised in warehouses as they have a high ceiling height. It’s often the most cost-effective way to grow within your current footprint. They have many uses such as storage, picking, production or offices, and each use comes with its own loading and fire protection requirements.
Offices and Partitioning: Within most warehouse locations there is a need for office space. Offices are usually built at ground level or on a mezzanine and divided with partitioning. Good offices give admin teams a comfortable, quiet place to work alongside the hustle and bustle of day-to-day operations.
Insulation and Cladding: Warehouses are usually colder buildings by nature; they’re usually tall, vast and therefore expensive to heat. With this comes the need for more fit outs to upgrade the insulation, cladding and roof panels, boosting thermal performance. This helps toward cutting running costs and meeting tightening EPC requirements.
Lighting: With all workspaces, lighting is extremely important. High bay LED solutions are now the standard; they’re brighter, more efficient and outlast older systems. Adding motion sensors or even daylight controls further brings down energy use.
Heating and Ventilation: As previously mentioned, warehouses often have vast, high, and often empty space; heating this would be rarely practical. Radiant heaters, zoned heating and well-planned ventilation keep the areas where people work comfortable without heating empty air.
Flooring: Warehouse flooring needs to be tough; it constantly takes heavy wear from pallet trucks, racking and even forklifts. Resin coatings, line marking and repairs to the existing slab improve durability, safety and the flow of traffic around the building.
Welfare Facilities and Canteens: With any workplace comes the legal requirements of welfare facilities; these include toilets, changing rooms, rest areas and canteens. Welfare facilities also play a large part in keeping staff and attracting more staff in a competitive labour market.
Racking and Storage: A large majority of warehouse space requires storage; therefore, alongside a fit out, racking or other storage solutions are usually specified.

Fit Out or Refurbishment?
The next question you might be asking is whether to refurbish the space you have or move somewhere new and fit it out.
Refurbishment usually makes sense if your location still works for staff, customers and transport links. It also suits a building that’s structurally sound but needs upgrading or a business that wants to avoid the cost and disruption of a move.
Moving and fitting out is often the better choice when you’ve outgrown the building even with a mezzanine. It also makes sense when the unit can’t meet energy or compliance standards without major work, or when a lease break or lease end gives you a natural point to reconsider.
Project Stages: Enquiry to Handover:
Every project runs slightly differently; however, most will follow the same general stages.
- Enquiry and Initial Consultation: Once your enquiry lands in our inbox, the first stage is to better understand your needs and your business. This includes what isn’t working in your current setup and what you would like to achieve in your new space. It’s also the perfect time to set out a budget, understand your timescale and explain any fixed dates such a lease ends.
- Site Survey: Once we know more about you, it’s time to learn about your new space. We’ll visit the new unit to measure up and assess the condition, services, floor slab, roof and overall site access. This also picks up any issues that are likely to affect the design or cost.
- Design and Brief: Your requirements are turned into a layout and specification. This covers where offices, mezzanines, welfare areas and storage will go, and how goods and people will move around the building.
- Proposal and Programme: You’ll receive a detailed quotation through email or as a presentation in person detailing the design and programme of works. We will also detail how long this project is expected to take with each part broken down. This is your chance to ask as many questions and make any changes needed.
- Approvals: Building regulations approval is needed for most fit outs, and mezzanines in particular need it. If you lease the building, you’ll also need your landlord’s consent, usually through a licence for alterations. Some changes need planning permission too. It’s worth starting these early so they don’t hold up the programme.
- Construction: The fit out begins. If your warehouse stays operational during the works, they can be phased so goods keep moving. Throughout the project, you’ll have one point of contact who keeps you updated on progress.
- Snagging: Although we aim to have minimal snagging on all projects, occasionally some small issues do crop up, chipped paintwork, a marked ceiling tile, etc. This is our chance to walk the site with you and rectify any issues before handover.
- Handover: Once all snags are rectified, you’ll receive the completion certificates, building control sign-off and the operation and maintenance manual.
Cost and Timeline Factors
There are many factors that can affect both time and cost; below are some of the most common:
Size of Unit: It goes without saying that the bigger the area which is being fitted out, the more it’s going to cost. More material, more labour and therefore more time. Scope matters as much as square footage, however. A large unit which only needs new lighting and an office may cost less than a tiny one in comparison to being fully fitted out.
Condition of the Building: The starting point is essential to the project; an old building or even a new neglected one may need structural repairs. If roof repairs, cladding or slab floor issues are found, this needs to be put right before anything can start. This will delay the timeline and will increase costs.
Mezzanine Load Capacity: Mezzanine floors which need to carry more weight, such as heavy machinery, need a stronger structure than ones used for office uses. The floor slab may also need assessing, both of which will push up costs.
M&E Upgrades: Mechanical and electrical work is often one of the biggest costs. Upgrading the power supply, lighting, heating, ventilation and fire alarms can add significantly to both the budget and the programme, especially in older buildings.
A Working Warehouse: If it’s essential your warehouse needs to remain operational throughout the fit out or refurbishment project, then phasing is a good option. This helps keep disruption to a minimum but can extend the timeline of the overall programme.
Typical Timescales: To give a rough idea, smaller projects such as constructing a site office or upgrading lighting can take a few weeks. On the other hand, a full warehouse fit out, including mezzanines, offices and welfare facilities, usually takes several months.
Compliance
Compliance is one of the most important parts of a warehouse fit out, and one of the easiest to get wrong. These are the main areas to consider.
Fire safety: Your fit out needs to keep or improve the building’s fire strategy. That includes safe escape routes, emergency lighting, fire alarms and fire separation between different areas. Mezzanines need particular care. Depending on their size and use, they may need fire-rated ceilings, protected columns and suitable escape stairs. All of this is covered by Part B of the Building Regulations.
Building Regulations: Most fit out work needs Building Regulations approval. This includes mezzanines, new offices and changes to escape routes. Alongside fire safety, Part L covers energy efficiency, and Part M covers access. Completed work is signed off by building control.
Health and safety (CDM 2015): The Construction (Design and Management) Regulations 2015 apply to all building projects. As the client, you have duties of your own, including appointing a competent contractor and making sure the work is properly planned and managed. An experienced fit out contractor will guide you through these.
Workplace welfare: The Workplace (Health, Safety and Welfare) Regulations 1992 set minimum standards for toilets, washing facilities, drinking water, rest areas, lighting and temperature. Many older warehouses fall short, so a fit out is a good chance to bring them up to standard.
Accessibility: Under the Equality Act 2010, offices, welfare areas and entrances should be accessible to everyone, including people with disabilities.
Energy performance: Minimum Energy Efficiency Standards (MEES) apply to leased buildings, and EPC requirements are expected to tighten towards 2030. Upgrading insulation, lighting and heating during a fit out keeps your building lettable and cuts running costs.
Real World Solutions
Over the years, we’ve designed and delivered warehouse fit outs for businesses across a range of sectors, each one built around how the client works. Some need design-led office space, like Cervus. Others need a practical packing and dispatch operation, like Rough Trade. Either way, the aim is the same: a space that helps the business thrive
Our warehouse fit out projects:
- Cervus, Defence Technology: An empty industrial shell in Wiltshire, turned into a workspace with a large mezzanine, offices, meeting rooms and full M&E.
- Rough Trade, Music Retailer: A new Bristol warehouse with an L-shaped mezzanine office and a zoned storage and dispatch layout.
- Barrettine Group, Chemical Specialists: A mezzanine office and breakout area above a working warehouse in Warmley, Bristol.
Why Avent Interiors?
We work across both office and industrial spaces, so we understand your operation as well as the people who keep it running. We deliver a complete turnkey service, from in-house design to mezzanine floors and racking, all carried out by our own directly employed teams. As a family-run business, we take pride in every project, and our client reviews and case studies speak for themselves.
If you’re thinkning about what to do with your warehouse space then get in contact today to arrange your Free Site Survey & No Obligation Quotation.
