Introduction
Our client for this project, Vertical Aerospace, is leading the way in electric vertical takeoff and landing (eVTOL) aircraft. Based in Bristol with sites across the South West, they design and build zero-emission aircraft that represent the future of intercity and airport travel. A long-standing client of Avent Interiors, we were thrilled when they approached us with this new opportunity.
Client background and Challenges
Vertical Aerospace has been operating since 2016; during this time we have worked with them on several previous projects, including multiple projects at their Bristol head office.
With operations already at Cotswold Airport, Vertical set their sights on the G2 hangar. An airside WWII-era hangar that was perfect in size and location, but needed extensive refurbishment.
We were onboarded to the project very early on to undertake some concept design work and site validations. On from which, the decision was made by Vertical to take on the property and our team then developed our design and scope of work.
The age and make up of the building brought its own unique challenges. From large areas of asbestos, damaged mains drainage and an inadequate structural slab for mezzanine installation to name just a few.



Project Goals and Requirements
The objective of this project was to create a client tailored aircraft assembly facility with adequate office, meeting and welfare facilities that was aligned to Verticals future growth ambitions. This saw the huge floorspace split into aircraft assembly within the main hangar, office and meeting spaces that would be installed within a new mezzanine structure and ancillary welfare facilities that were part of the buildings original structure.
The brief called for:
- A refurbished hard-wearing resin floor within the aircraft assembly area.
- Mezzanine floor structure to house two levels of office and meeting space
- Overhaul of all power and lighting installations, inclusive of new distribution boards.
- Full data cable installation to the newly formed comms room.
- Complete HVAC and mechanical installation.
- Fire system overhaul covering entire building.
- Full refurbishment of welfare facilities, including showers, changing areas and kitchen.
- Complete furniture package.
- Wall murals and signage.
- Interior finish that aligned with Verticals renewed branding guidelines.
Solution and Implementation
After months of planning, design revisions, site investigations and asbestos removal, our 16 week construction programme commenced. The programme was without question a challenge, but our team worked closely with our supply chain to ensure that daily, weekly and monthly we hit key milestones.
Our site team really pulled out all the stops to keep this project on track, and each week was truly transformative.
Hangar Refurbishment
The hangar refurbishments kicked off by grinding down more than 2,600 sqm of the existing hangar floor and later finishing it with an epoxy resin system. New LED high bay lighting was installed across the working floor, supported by a new distribution board and perimeter power. Walls around the perimeter were lined with fire retardant plywood, and damaged fire exit doors and cladding were replaced or repaired. The main hangar also saw a Vesda air sampling fire detection system installed due to the heights within the hangar roof void.
Mezzanine and Office Structure
On from undertaking a test of the structural slab and due to loading requirements of the office mezzanine floor, it was deemed that reinforced pads were installed to take the proposed column structure. A mezzanine structure was designed to house office, meeting and welfare facilities across two levels, with a third level being installed to house the structures HVAC system. This totalling approx. 515sqm in total across the tiers.
Partitioning, dry lining and fire rating of the structure followed and the team worked tirelessly to get this installed as quickly as possible to allow electrical, mechanical and HVAC teams to commence within the new office structure.
Office Fit Out
Inside the structure, we constructed offices, meeting rooms, a boardroom and a conference room using acoustic partitioning, curved entrance partitioning and black-framed fire-rated glazing, finished with Vertical Aerospace hummingbird logo manifestations. Thirty oak veneer door sets, white and black suspended ceilings, a walnut acoustic slat wall and new flooring throughout completed the look.
Services
A substantial HVAC system was installed to heat and cool ten zones, alongside heat recovery fresh air units serving the offices, meeting rooms and changing areas. We upgraded the incoming water main, installed new water feeds and waste pipework throughout. This topped off with a comprehensive fire alarm system that covered every part of the building. During the programme, a full installation of access control throughout the building was added to our scope of works which was subsequently completed within the programme.



Welfare and Kitchens
The ground floor gained a new kitchen and coffee point, with a tea point on the first floor mezzanine, all fitted with boiling and chilled water taps. The existing toilets were fully refurbished with new cubicles, aqua panelling, showers and accessories. Alongside these works, mains drainage repairs were undertaken to overcome damaged and collapsed drains.
External Works
Outside, within the courtyard garden we cleared and resurfaced the courtyard with decorative stone, installed a composite enclosure for the external air conditioning equipment, renewed external glazing and installed a new set of glazed entrance doors. Areas of cladding were also replace or repaired where required. The external works were topped off by the complete cladding re-spray of the hangars front elevation. This really transforming the front of the building and bringing it back to life.
Results and Client Feedback
The completed project provides Vertical Aerospace with the ability to push forward with their wider business plan and route to market. What was once an empty WWII era hangar is now an integral part of Vertical Aerospace’s property portfolio.
G2 Hangar now provides a unique space, tailored completely to their requirements to assemble aircraft and house a large portion of their Cotswold Airport based workforce.
The feedback from the Vertical team has been nothing short of excellent and we are already working with them again on their next set of projects.
The hangar has been part of a wider PR release with the BBC and other news outlets covering the opening of the facility. Alongside Vertical staff, the media and sector partners, Avent Interiors were invited to the opening ceremony. A proud day for us to see the finished project in all its glory!
"It’s been a challenging one at times, but we’re really pleased with how everything has come together. As always, it’s been a pleasure working with Avent. The professionalism and collaborative approach your team brings is one of the reasons I always enjoy working with you all."
Stacey Collins Workplaces and Business Support Lead, Vertical Aerospace
Conclusion
A challenging building and brief, overcome by detailed design and relentless work. This project highlights how historic buildings can be transformed into high-performance, future-focused facilities.
What was once an empty WWII era hangar is now an integral part of Vertical Aerospace’s property portfolio and we couldn’t be prouder of the outcome.
In just over 16 weeks, we brought this building to life and it is now fully operational allowing Vertical to take important steps in their vision