The first month of Q4 has been as busy as ever. We’re coming to the end of a range of projects across Bristol and even further afield. It’s not all been about achievements on site, however; we’ve had some wins in the classroom, and we’ve been out and about spreading the word.

Apprenticeship Success for Tom

We’re proud to announce that Tom Roberts, a member of our employed site team, has officially completed his Interior Systems Installer apprenticeship, specialising in dry lining.

Since joining Avent, Tom has shown himself to be a conscientious, hard-working member of the team. He’s always willing to learn, keen to pick up new skills and quick to help out wherever he’s needed, whether that’s supporting colleagues on site or getting stuck in to keep a project on track. He turns up every day with a positive attitude, a big smile and the right tools for the job. That makes a real difference to the people around him and to the quality of what we deliver for our clients.

People like Tom make construction work. Please join us in giving Tom a big round of applause and a huge thank you from everyone at Avent. Well done, Tom! We’re looking forward to seeing what comes next!

Back in Bath: Revisiting a Completed Fit Out

We recently headed back to Bath to capture one of our completed fit outs, one of our largest and most ambitious to date. It was great to see how the team are using the space.

When Equisoft sold part of their business, their existing Bath office was split in two, and the remaining team needed a new home. We fitted out the first floor at Royal Mead, creating a modern, flexible workspace that balances collaboration with privacy and reflects the Equisoft brand.

The fit out included glazed and solid partitioning for boardrooms, meeting rooms and call booths, acoustic insulation and rafts to keep noise down, and bespoke joinery, including kitchen and boardroom seating. A fully fitted kitchen and breakout area, new ceilings and lighting, upgraded air conditioning and 51 data points for WiFi, TV and room booking completed the space.

It was great to see it being put to good use.

Project Completion for a Household Name

Moving over to our project updates this month, we’ve recently completed our fit out for a huge household name. Lea & Perrins came to us wanting to refurbish their HQ in, you guessed it, Worcestershire. Based in a building steeped in history, the office space had not been touched in years; one notable outdated feature was the crescent desking, which took up more space than needed.

The project, which spanned over 7 weeks, saw us strip the space back and bring it up to date while keeping the building’s character. Out went the old desking, tired ceilings and dated air conditioning. In came a new suspended ceiling grid with 25 anti-glare LED panels, and we flooded the office with natural light by unboarding the original skylights.

One of the standout transformations was the original hardwood flooring. We mechanically sanded the main office floor back to bare timber, filled the gaps across the boards and finished it with two coats of extra matt lacquer. The result is a durable, natural finish that brings out the character of the timber and suits the building’s heritage perfectly.

The main office now has three glazed nooks for focused work and quick catch-ups. Each one is finished with oak acoustic slat panelling, reeded manifestations and a wooden pegwall between them. The two meeting rooms were fitted with fluted wall panels, new linear lighting and a bespoke etched Lea & Perrins acoustic panel, a nice nod to the brand’s heritage.

Behind the scenes, we installed new floor boxes for power and data, two Daikin ceiling cassette systems, and upgraded fire detection. The result is a bright, modern and practical workspace that still feels at home in a building with this much history.

Vertical Aerospace Hangar: A Project Landed Successfully

We’re over the moon to share this incredible project completion.

We’ve completed several projects for Vertical Aerospace over the years, but this one was our biggest and certainly our most unique.

G2 Hangar is an airside WWII-era hangar at Cotswold Airport. Despite asbestos, damaged drainage and a floor slab that needed reinforcing, our team turned it into an aircraft assembly facility with a 515 sqm mezzanine office block inside, all in a 16-week construction programme.

The facility has since been officially opened, with coverage from the BBC, and we were proud to be at the opening ceremony.

Watch the fly-through or read the full story below.

It’s been a challenging one at times, but we’re really pleased with how everything has come together. As always, it’s been a pleasure working with Avent. The professionalism and collaborative approach your team brings is one of the reasons I always enjoy working with you all.

Quote

Stacey Collins Workplaces and Business Support Lead, Vertical Aerospace